All Areas Demolition Excavation were selected to carry out the demolition and removal of the old sewer pump station located in Mertin St, Bourke, western NSW.

The works involved included:

    • Demolition of building on top of existing pump station including, roofing, windows, handrails, internal fitout and alike
    • Demolition of existing monorail crane structure
    • Demolition of existing concrete masonry odour control structure
    • Demolition of the pump station lid/roof and external walls.
    •  Demolition of all internal pipework, handrails, ladders, pit covers, pump pedestals and rails
    • Demolition of existing inner well and landings
    • Demolition of the dividing walls which separates the base of the pump station in two
    • Demolition of the ‘V’ drain at the base of the pump station
    • Excavation to expose and remove/demolish the pipe entering the valve pit and the existing rising main entering the pump station

photo 2  photo 3  IMG_1160  photo 4  2 Begin to cut tank   3 Cutting tank IMG_1186   4 Cutting top rim of centre  5 Tank lid lift  6 Lifting top of centre from tank  7 Centre lifting out  8 Cutting lower centre  9 JP cutting lower centre

7 Centre lifting out  10 Cutting bottom of centre  12 Bottom of tank after centre removed  11 Robot bottom of tank

13 Install new tank  14 New tank in place  15 New tank in place 2  16 New tank new lid in place

 


18-08-17 Demolition services in Coffs Harbour area

Did you know that All Areas Demolition Excavation, really do cover all...

01-08-17 Safe Work Australia “Tradies Health Month”

August is Safe Work Australia’s ‘Tradies Health Month’. Although tradies only make...

19-07-17 Serviced Areas

All Areas Demolition Excavation are available for all asbestos removal & demolition...

View All Latest News
02 6654 9417
02 6654 9419
click to email us
© All Areas Demolition Excavation 2012 - 2017 All Rights Reserved :: Website by Giant Media :: ADMIN